Introduction to the installation and use tutorial of high-pressure reactor 1
Oct 01, 2023
Leave a message
Today we will take a look at the installation and use tutorial of the high-pressure reactor:
1. Installation location: The high-pressure reactor should be installed in a high-pressure operating room that meets explosion-proof requirements. When equipped with multiple autoclaves, they should be placed separately. Each two autoclaves should be separated by a safe explosion-proof wall. Each operating room should be There are passages and exits leading to the outdoors. When explosive media are present, the equipment should be well ventilated.
2. After opening the package, check whether the equipment is damaged. Install the equipment according to the structure diagram below according to the equipment model. If the heating method is electric heating with thermal oil, please purchase the corresponding type of thermal oil according to the operating temperature. Note: Thermal oil is not allowed to contain When adding water, open the oil filling port on the upper part of the jacket and the oil level port on the middle and upper part of the jacket. Add oil through the oil filling port until oil flows from the oil level port. Then tighten the oil level port. Do not tighten the oil level port. Tighten the oil filler port to avoid pressure. Check the accessories according to the packing list.
3. Installation and sealing of the cauldron body and cauldron cover: The cauldron body and cauldron cover use line contact between the gasket or the conical surface and the arc surface. By tightening the main nut, they press each other to achieve a good sealing effect. When tightening the nut, the Tighten diagonally and symmetrically multiple times and gradually with even force. Do not allow the kettle lid to tilt to one side to achieve a good sealing effect. When tightening the main nut, the specified tightening torque of 40~120NM must not be exceeded to prevent the sealing surface from being squeezed. If the sealing surface is damaged or overloaded, special care should be taken of the sealing surface. Before each installation, wipe the upper and lower sealing surfaces clean with soft paper or cloth. Pay special attention not to scratch the sealing surfaces of the cauldron body and cauldron lid. If operated properly, it can After being used for more than tens of thousands of times, after the sealing surface is damaged, it needs to be reprocessed and repaired to achieve good sealing performance. When disassembling the cauldron cover, the cauldron cover should be slowly lifted up and down to prevent the sealing surfaces between the cauldron body and the cauldron cover from colliding with each other. If the seal is made of PTFE, aluminum pad, copper pad, asbestos pad, etc., a good sealing effect can be achieved by tightening the main nut.
4. When installing valves, pressure gauges and safety valves, the sealing effect can be achieved by tightening the front and back nuts. The arc sealing surfaces at both ends of the connection must not rotate relative to each other. Lubricant or lubricant must be applied to all screw joints during assembly. Graphite mixed with oil to avoid seizure. Use of valves: The needle valve is a line seal. You only need to turn the valve needle slightly and press the cover tightly to achieve good sealing performance. Do not use excessive force to avoid damaging the sealing surface.