Introduction to the installation and use tutorial of high-pressure reactor 2
Oct 04, 2023
Leave a message
5. After the equipment is installed, pass in a certain amount of nitrogen and keep the pressure for 30 minutes, and check for leaks. If any leaks are found, use soap foam to find the leak points in the pipes and pipe mouths. After finding them, release the gas and tighten them, and then pass them through again. Enter the nitrogen pressure holding test to ensure that there is no leakage and then start normal operation.
6. When heating, the heating rate should not be greater than 100℃h, and the heating power should be slowly added from low voltage. When cooling down,
7. Safety device: It adopts a positive arch-type metal blasting disc, made of stainless steel. It is manufactured according to the standard CB67-89 "Technical Conditions for Arch-type Metal Blasting". It has been tested before leaving the factory and cannot be adjusted at will. If it has burst, it needs to be replaced. The replacement period is determined by the user based on the actual situation of the unit. For bursting discs that exceed the calibrated bursting pressure but have not burst, they should be replaced. Regular use does not exceed 80% of the lower limit pressure of the bursting disc. When replacing, Note that the convex side of the bursting disc faces upward.
8. After the reaction is completed, cool down first, and then release the gas in the kettle to the outside through the pipeline to reduce the pressure in the kettle to normal pressure. It is strictly prohibited to disassemble under pressure, and then loosen and remove the main bolts and nuts symmetrically. Then carefully remove the cauldron lid or lift the cauldron lid and place it on the bracket. Pay special attention to protecting the sealing surface during the lid removal process.